PROJECTS

What We Do ...
Installation - erection, testing, commissioning, operation & maintenance, condition monitoring in power Sector from Low Voltage Level to Extra High Voltages and liaison with Government sector and PSU are key components of our services. We deliver our services to clients as per technical specifications and requirements of client. We are keen to complete assignments within specified time with high quality standards. Within tenure of last 2.50 years, we have executed more than 60.00 Nos of assignments successfully.
Work Done ...
  • Erection, testing and commissioning of Power Transformer 20 MVA to 75 MVA: 18.00 Nos
  • Dismantling of Power Transformer 2 MVA to 65 MVA: 14.00 Nos.
  • Erection of 132KV Line Bays: 08.00 Nos.
  • Erection of 132 KV Transformer Bays: 6.00 Nos.
  • New Erection / Rearrangement of 33KV Indoor Substation: 02.00 Nos.
  • Dismantling of 66KV Substation (total: 20 bays – Line and TR): 03.00 Nos.
  • 66KV / 132KV Switchyard retro-fitting projects: 04.00 Nos.
  • 11KV Panel board Erection, testing and commissioning: 10 Nos. (Each panel Board have 14 to 20 Circuit Breakers)
  • Dismantling of 11 KV Panel Boards: 10.00 Nos. (Each panel Board have 14 to 20 Circuit Breakers)
  • 33 KV Panel board Erection, testing and commissioning: 07.00 Nos.
  • Control and Relay Panels Erection, testing and commissioning: 18.00 Nos.
  • Erection, testing and commissioning of 11KV Capacitor Banks (2.666 & 4.666 MVAr) and Series Reactor Sets: 25 Nos.
  • Different Testing Assignments from LV to 132KV: 40 Nos.
  • Laying / Recovery of 11KV / 3 Core Power Cable: 35.00 Kms.
  • Laying 33 KV / 3 Core Power Cable: 7.5 Kms.
  • Laying / Recovery of 66KV Cable: 5.00 Kms.
  • Laying / Recovery Control Cable: 95.00 Kms.
  • 11KV Indoor / Outdoor terminations: More than 250.00 Nos.
  • Control Cable glanding and terminations: More than 1500.00 Nos.
  • Erection and Dismantling of M.S. or Steel structures for switch yard equipment: 160.00 Tons.
  • Power Transformer Oil Filtration: 1000000.00 Liters.
  • DGA of power transformer oil: More than 45.00 Nos (ERDA – Vadodara)
  • Maintenance of Transformer 90KVA to 140 MVA: 145.00 Nos. (Thermal Power Plant – Annual Shutdown)
  • Maintenance of Panel Boards 415V to 11 KV: 130.00 Nos. (Thermal Power Plant – Annual Shutdown)
  • Maintenance of 110MW Generator, Main Bus-Duct and Associated equipments: 03.00 Nos. (Thermal Power Plant – Annual Shutdown)